Year

2021

Stadium surface

7598 m²

Reconstruction of the stadium at Murjāņi Sports Gymnasium was started in 2020. The stadium seat stands were rebuilt, and the surface was renovated with a new base layer and Conica Conipur SW surface covering. Sports equipment was supplied and installed. The works were finished in August 2021.