Sporta Halle SIA was the general contractor renovating the Limbaži Stadium. New Tetrapur ENZ II synthetic rubber flooring was laid. Asphalt covering was also renewed at the site, and sports equipment was supplied and fitted.
Limbaži Stadium
Year
2020
Synthetic flooring
5090 m²